Find Transfer Switches By: | Asco 185 Series 200 Amp Transfer Switch185A2200F4C|Type 1 Indoor|2 Pole|200 AMPPart #:185A2200F4C True double-throw
contacts with inherent
mechanical interlocking
to prevent connection
of generator and utility
sources Need More info?
Call our experienced generator specialists : 1 800 922 5632. If you would like a Continental Generators representative to contact you please submit our customer inquiry form and we will assist you as soon as possible
- User-friendly control interface with easy to understand symbols and visual indicators to inform operator of transfer switch and power source status.
-
Listed to UL 1008 for optional standby systems, handling total system load including motors and all other electrical loads.
cUL Listed for Canadian installations.
-
Meets Article 702, NFPA-70 National Electric Code (NEC) requirements.
-
Nominal service voltage 240V 50/60Hz, single phase, 3 wire AC systems.
-
Available in 100 through 400A ratings.
-
True double-throw contacts with inherent mechanical interlocking to prevent connection of generator and utility sources.
-
Terminals for convenient connection of neutral and ground conductors.
-
Available in NEMA Type 1 Indoor (steel) and Type 3R Outdoor (aluminum) enclosures, with hinged door designs.
-
Textured RAL 7035 light beige color aesthetically suitable for residential applications.
-
Available in load-break manually operated version, up to 230A.
Series 185 Control Panel
- Push Buttons
-
On the front control display are three push buttons that control the operation of the generator and the ATS.
-
Before using the transfer test button, be sure that conditions are safe for running the generator and
for load transfer.
-
Transfer Test:
-
Use this button to test the system. This operation starts the generator and transfers the load.
- Be sure that
conditions are safe to do this operation.
-
Bypass Time Delay:
-
Use this button to cancel the active time delay or exercise period (stops the generator after cooldown).
-
Set Engine Exerciser:
-
Use this button to set the automatic generator exerciser
-
Indicator Lights
-
On the front control display are five lights that indicate the status of the sources and the ATS.
-
Utility Acceptable:
-
This light indicates that the utility voltage is acceptable for connection to the load.
-
Generator Acceptable:
-
This light indicates that the generator voltage is acceptable for connection to the load.
-
Load on Utility:
-
This light indicates that the generator voltage is acceptable for connection to the load.
-
Load on Generator:
-
This light indicates that the generator voltage is acceptable for connection to the load.
-
Automatic Generator Exerciser:
-
When the utility is acceptable and the load is on the utility, this light flashes the number of days until the next exercise period.
- When it is off, no exerciser period is set.
- The light is also off when the generator is running.
-
User-adjustable Settings
-
Time Delays
-
Adjustable 1 or 3 second time delay for overriding momentary
- utility source disruptions
-
Adjustable 0 or 4 second time delay while on standby source to ignore momentary generator voltage dips
-
5 minute time delay before load retransfer back to utility source, to ensure stability of utility power
-
Adjustable 2 or 5 minute unloaded running time delay allows generator to cool down prior to shutdown
10 second time delay before load transfer to emergency source, to allow generator warm-up and stabilization
Type 1 Indoor |
Featured ProductRobin Subaru RGD5000H Portable Generator - Robin Subaru RGD5000H Portable Generator - great for emergency generator use. click here for more info
|